Canyon Boulevard Trail
Through a design competition, CSG was selected to design the new Logan City Canyon Boulevard Trail. The final trail design is exciting, safe and innovative. The trail features two sections which are raised approximately 24”-36” above the Canyon Boulevard road. Benefits of raising the trail include: saving on construction cost by retaining less hillside, increase safety by separating users from the road and creating incredible user views of the First Dam Reservoir and Logan Canyon. The trail is 8 feet wide and made of concrete. This project included:
- 3,443 feet of concrete trail
- Safety Railing along portions of the trail
- Storm Water Drainage on-site
- Placing of boulders to prevent access to trail via motor vehicles
- Retaining walls to hold back soil along hillside
Services Provided:
- Project Administration
- Utility Design
- Site Design
- Construction Documents
- Storm Water Planning
- Community Planning
- Construction Administration